boiler bank tube expansion procedure
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
In the majority of cases boiler tubes are expanded, and then bell-mouthed into drums or headers. For large diameter tubes, such as downcomers, grooved seats are used to assist the expansion in forming a tight seal. Where high temperatures are involved, as with superheater tubes, welding may be used in place of expanding. Tubes AttachmentsGet Price
Bank tubes in bi-drum boilers act as raisers and down comers between the two drums. They also carry the load of There are times when all the bank tubes need changing. The procedure will have to be carried out by an expert group the insertion and subsequent expansion of the bank tubes have to be carriedGet Price
Condenser tubes 18-24 BWG +/- 0.0005" Boiler tubes 4 -10 BWG +/- 0.002" Boiler tubes 12 -16 BWG +/- 0.001" 5. The rolling control is now set and ready to roll the rest of: the tubes in the unit. The use of the torque control system will ensure the uniform tightness of all tubes. Note! Reroll all test tubes that were under size.Get Price
Guidelines for replacement of generating bank tubes . with expanded joints in two-drum boilers. Scope . This Technical Information Paper provides guidelines for the removal and replacement of generating bank tubes with expanded joints in two-drum power andrecovery boilers. In a two-drum boiler, the seal between the generating tubesGet Price
Oct 08, 2015 · How do those Boiler Tubes stand up to the high pressure of steam? Today, Ritchie and Steve discuss beading, rolling and welding a boiler tube. Steve TaylorGet Price
Bank Tubes in Process Boilers - Bright Hub EngineeringGet Price
Cost of boiler tube failures 9/4/2013 Steag O&M Company 7 The cost of boiler tube failures is comprised of three main components; the cost of the repair, the cost of start up oil to return unit to service, and the cost of lost production. A rule of thumb for repair costs of 200000 per day out of service+ cost of materialGet Price
Water tube boilers are classified as follows: 1. Horizontal straight tube boilers (a) Longitudinal drum (b) Cross-drum. 2. Bent tube boilers (a) Two drum (b) Three drum (c) Low head three drum (d) four drum. 3. Cyclone fired boilers Various advantages of water tube boilers are as follows: (i) High pressure of the order of 140 kg/cm2 can be Get Price
Bank Tubes in Process Boilers - Bright Hub EngineeringGet Price
Jan 01, 2021 · In Bi- drum arrangement, the boiler bundle of tubes connecting both the drums are called bank tubes. Bank tubes connect both the drums so that the ends of the tubes protrude 10 to 12 mm above the drum's inner surface . Bank tubes are fixed in both the drum with the help of expansion joints.Get Price
Feb 05, 2011 · The bank tubes are expanded for three (3) reasons. 1. First of all it has to do with flow. When the tube is expanded it reduces the inlet pressure in the center of tube thus reduces flow. This provides flow stability or a reduction in turbulance. Once pressure stabilizes it is pushed through the restricted outlet.Get Price
Feb 10, 2004 · Differential thermal expansion can result with thicker tube sheets. When the expansion due to heat varies noticeably between the thinner tube and tube sheet, a shift of the tube results. One of the most important steps for ensuring a safe and permanent tube joint is to thoroughly clean the surfaces of the tube end and the tube hole wall. These twoGet Price
Mar 04, 2010 · Once the tube OD touches the drum hole ID, the expander torque will increase indicating the tube has touched the drum hole ID. D2 = Tube ID after rolling T1 = Tube wall thickness before rolling. Note: Even at touch roll point the thickness of the tube is the same as that before starting touch expansion. Percentage thinning = 50 x (D2 - D1) ÷ T1Get Price
Apr 30, 2013 · 30 Apr 13 22:17. We manufactured a removable u bend heat exchanger. For the expansion of the tube. We received a last minute info from our client that the tube weld joint cant be expanded. Which means the expansion starts few mm from the face of the tubesheet, and the first few mm (4~5mm approx) of the tube are unexpanded.Get Price
Manufacturer of Boiler Tube - Boiler Bank Tube offered by M/s Gambheer Engineers And Traders, Muzaffarnagar, Uttar Pradesh.Get Price
Tube bank penetration – the maximum effective cleaning distance when directed into a bank of tubes. Lance tube – the tubular component of a retractable-type sootblower that travels into and out of the combustion zone and flue gas passages. Wall box – an attachment to the boiler wall at the opening made for the cleaning device. It provides Get Price
between tubes. Screen tubes, when used, shall be considered as the first plane of entry. Furnace volume - the cubic contents of the space provided for combustion of the fuel. Heat transfer surface (in the boiler bank) – it shall be calculated as exposed tube surface beyond furnace limits excluding superheater surface. No coveredGet Price
design an external stopper or guide is required to guide the boiler expansion. A restraint is required to ensure the drum center point is anchored to the structure. Case 2. Lower drum hanging from top through bank tubes When the lower drum is supported through bank tubes, the mud drum should be free from any restraint. ASH HOPPERSGet Price
• 3.3.4.9 TUBE PLUGGING IN FIRETUBE BOILERS When replacement of a tube in a firetube boiler is not practicable at the time the defective tube is detected, with the concurrence of the owner, Inspector and when required, the jurisdiction, the tube …Get Price
Bank Economizer Circulation in Two-Drum Boiler Top drum is a steam-water separator Hot feedwater enters – steam leaves Generating bank is its own natural circulation loop Rear tubes act as downcomers Forward tubes act as risers Mud drum is source of water to all other loops Floor and waterwall headers Furnace screen headersGet Price
Abe got with Xavier a former student of SCWA to to show you how they weld a tube panel! Here is some boilermaker welding coming at you! They will showcase thGet Price
Oct 07, 2016 · Reason for bank tube Failure. The main reason for bank tube failure is due to inadequate expansion. More than 1000 bank tubes will be there and its difficult to measure the tube thinning for all the tubes after expansion. tube thinning measurement is done randomly for 200 tubes after expanding all the tubes.the requires torque is applied using expander to all the …Get Price
Thermal Expansion Of Boilers (687.04 Kb) Simplified Boiler light up method for FBC boilers (389.57 Kb) SHUT DOWN INSPECTION OF A CHINESE MAKE CFBC BOILER (7.42 MB) Preservation of Boilers (54.73 Kb) Options for Savings in Modern Rice Mills (42.71 Kb) Natural Circulation in Boiler (350.85 Kb) Literature on Boiler Tube Fit up by Expanding (298.87 Kb)Get Price
Boiler tubes are assembled by welding or by expanding. Expanding is mainly adopted in Boiler bank assembly. Expanding is resorted to, as it is the simplest way to fit the tubes in boiler bank. In this subject of tube expanding one may not find good literature regarding the % thinning to be adopted and the sequence to be adopted.Get Price
May 18, 2018 · Boiler design is the process of designing boilers used for various purposes. The main function of a boiler is to heat water for steam generation. Steam produced can be used for a variety of purposes including space heating, sterilization, drying, humidification and power generation. The temperature or condition of steam required for these applications is different, …Get Price
This Technical Information Paper provides guidelines for the removal and replacement of generating bank tubes with expanded joints in two-drum power and recovery boilers. In a two-drum boiler, the seal between the generating tubes and the drums is created by either mechanically rolling or hydraulically expanding the tubes into the tube seats.Get Price
In the majority of cases boiler tubes are expanded, and then bell-mouthed into drums or headers. For large diameter tubes, such as downcomers, grooved seats are used to assist the expansion in forming a tight seal. Where high temperatures are involved, as with superheater tubes, welding may be used in place of expanding. Tubes AttachmentsGet Price
Fire Tube Boilers Also referred to as smoke tube boilers, shell boilers, package boilers Multiple gas paths - 2, 3 and 4 pass Internal furnace or fire box as the 1st pass Dry back or wet back design Single fuel or dual fuel design Little or no steam separation equipment.Get Price
Alternative water-tube boiler layouts. The following layouts work on the same principles as other water-tube boilers, and are available with capacities from 5 000 kg/h to 180 000 kg/h. Longitudinal drum boiler. The longitudinal drum boiler was the original type of water-tube boiler that operated on the thermo-siphon principle (see Figure 3.3.5).Get Price
and more. Backed by more than 5,000 units and 150 years of experience, B&W's water-tube package and industrial boilers have an established reputation for reliability and proven performance. They are engineered to meet unique capacity, space, fuel, emissions, transportation, installation and other requirements. They offer reliable power with low Get Price